2008-2014 Position: Factory Manager; G.I.F. Engineering Co, Ltd. (Location in Bangkok Province)
G.I.F. Engineering Co, Ltd business is Auto-Part & Tool of Kitchen Stainless and my responsibility is control production section, engineering section, quality assurance section, raw material and finish goods in ware house section, logistic section, personal section and production planning for continually productivity ,accounting section, HR section , Control project installation for improvement increase productivity ,Control cost for Preventive Maintenance not over budget, design layout production line and control installation construction & system all the factory by auto-cad & sketch up program and ISO9001:2008 system & TS16949 of Company. Build GIF System apply from Toyota Production System Control cost of factory follow by budget of monthly and yearly. Used TPS System for improvement on working site. Staff and manpower 300 persons. And help to improvement associated company (A-Best) business plastic injection 2-year manpower 200 persons.
A proud success: Build up GIF System by applying from Toyota Production System to implement on 2011-2012
Re Certified ISO9001 product and process to factory in 2012
tabtab Certified TS16949 product and process to factory in 2012
2002-2008 Position: Deputy Factory Manager Department. Company: C&W Interfood Co., Ltd (Ayutthaya Province) Food Business (Bakery) start by controlling installation factory building structure and system work, perform of Preventive Maintenance machine and utility system, boiler system (Boiler 2 tons), Air Compressor, Freezer system, Generator system and wastewater treatment for continually productivity and set up GMP, HACCP และ ISO 22000:2005 system of Company. Control cost for Preventive Maintenance not over budget, Control project installation for improvement increase productivity, design layout production line and control installation construction & system all the factory by auto-cad program. Sales per year are 450 million baht. Staff and manpower 350 persons.
A proud success: Design layout production line and control installation building – facility of factory
tabtab Control Installation silo of flour for automatic system to production line
Set up logistics and transportation cars from factory to customer.
tabtab Certified GMP & HACCP products and process to factory in 2002
Certified ISO22000 product and process to factory in 2004
1998-2001 Position: Engineering Manager and Environmental Representative of Sinrapasenee Company Limited. (Samut Prakran Province) Textile Business wash, dye and finishing perform of Preventive Maintenance machine and utility system, boiler system (Boiler 12 tons, 3 tons), and wastewater treatment for continually productivity and set up ISO 14001 system & ISO9001 of Company. Control cost for Preventive Maintenance not over budget. Staff and manpower 200 persons.
A proud success: Set up maintenance program follow up by ISO9001 system and implement in 1998.
tabtab Leader for set up ISO14001 system to implement and representative of Thailand to visit an environmental management system event in Germany for 16 days in 2000
tabtab Control installation new boiler 12 tons and test run to produce in 1999
1992-1998: Position: Electrical Engineer Company Jardine Matheson (Thailand) Co., Ltd. (Location Bangkok) Control Installation Transformer, MDB, Load Center, Bus duct, Telephone System, CCTV System, MATV System, Fire Alarm System, Generator System, Lighting System, Lightning System, and Automation Building System. Planning Schedule of Project, Cost Control of Project, and Plan Material on site. Control subcontract 100 persons, supervisor 2-person, draftsman 1 person, Valued of Project 50-100 million baht.
1992-1993 Control Installation Electrical System and Communication System of Panya Indra Golf (Club House) 500 KVA 1992-1993 Control Installation Electrical System and Communication System of Panya Indra Golf (Sport Center) 300 KVA 1994 Control Installation Electrical System and Communication System of TBI RIVER VILLA Condominium 24 Floor (2 X 800 KVA)
1995-1998 Control Installation Electrical System and Communication System of THE REGENT ROYAL PLACE 2 Condominium 25 Floor (2X 800 KVA) 1996-1997 Position: Engineering Consultancy Electrical System and Communication of Siam University and Siam School Project 500 KVA 1996-1997 Position: Engineering Consultancy Electrical System and Communication of Siam School 7 Floor Project 300 KVA
1996-1998 Position: Engineering Consultancy Electrical System and Communication of Siam University Project 500 KVA
ประวัติการฝึกอบรม
มิถุนายน 2553 ถึง มิถุนายน 2553
คิวคอมแพค จำกัด
ISO 9001:2008 (Internal Audit)
กรกฎาคม 2553 ถึง กรกฎาคม 2553
ไทย-เยอรมันและศูนย์เทคโนโลยีไฮเทคอยุธยา
9 กลยุทธ์สุดยอดการบริหาร
กรกฎาคม 2553 ถึง กรกฎาคม 2553
กรมพัฒนาฝีมือแรงมือแรงงาน (ระยอง)
การจัดการคลังสินค้าแนวคิด ลีน
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 45 คำ/นาที อังกฤษ 35 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,
-ใช้โปรแกรม Auto Cad ออกแบบการวางไลน์ผลิต
-การบริหารโครงการ งานระบบอาคารสูง