1. Installation Checking M&E System In Standard Content
2. Coordinate With Subcontractor.Foreman Structure&architecture,Foreman interior
3.Report Progressive Of M&E System To M&E Engineer (Installation Work)
4.Test&Commissioning
5.Weekly Site Meeting And Take Care Safety Work
1.Demolish Work Of M&E For New Installation Follow New Plan Such As Chiller Plant&
Ventilation System,Fire Protection System,Water SupplyAnd Drainage System, Power Supply System
2.Demolish Work Of Existing Chiller&Cooling Tower With The Way Separates And
Installation New Chiller&Cooling Tower With The Way Bring Assemble At Chiller Plant
3.Demolish Water Pump Of Chiller System And Installation New Water Pump
4.Overhaul Work As AHU,FCU,MOTOR,PIPING
5.Relocation Work Of Toilet
6.Renovation Work Of M&E
7.Coordinate With Building Supervisor Such as Building Engineer for inform Area working
8.Report Progressive Of M&E System To M&E Japanese Manager (Installation Work)
9.Test&Commissioning
10.Weekly Site Meeting And Take Care Safety Work
1.Work Supervisor Sets Up And Check System Air Conditioner&Ventilation System
Plumbing System , Utilities System ,Fire Protection,Waste Water Treatment System
2.Take off Equipment,matterail from drawing for order to installation work
3. Plan Installation Work For Mechanical
4.Coordinate With Site Engineer,Draff man And Subcontracter
5.Test&Commissioning
6.Maintanance and Service M&E Such as Electrical system,Water Supply, Air Condition
2001-2006 Technician position (Ramita Trading Co.,Ltd.)tabtabtabtabtabtabtabtab
Responsibilitytabtabtabtabtabtabtabtab
1.Service The Machine Product The Food,Refrigerator&Freezer,Electric Ovenstabtabtabtabtabtabtabtab
Air Condition At Department Store All in Thailand As Big-C,Lotus,Carfulltabtabtabtabtabtabtabtab
1.Certificate Through The National Skill Standard Department Airconditioning Repair In home And Commercial
2.Certificate Trained Security Supervisor By The EPA.
3.Have Knowledge Air Cooled Chiller And Water Cooled Chiller System (Basic Maintennance)
4.Have Knowledge Basic Electrical Power& Electrical Control System
5.Be Omniscient At The Beginning Work System Engineering
6.Maintanance Of Electrical,Plumbing And Air Condition System
7.Understand Construction Step Of Architecture And Structure Work Such As
Post Tension Floor & Precast Concreat Wall Panel Installation Work
8.Understanding Step of Interior Work
9.Understand And Can Read Shop Drawing Of Structure Work,Architecture and Interior Work
10.Have Knowledge Basic Of Estimate For Mechanical Work
11.Can Plan Installation Work Of Mechanical System
12.Can use English for Communication Reasonable
13.Able to use AUTO CAD For Revise
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
1.Project Daido New Factory Wellgrow Industrail Estate Check the job by Main Contractor
Thai Obayashi CO.,Ltd
2.Project Daifuku New Factory Pinthong Industraik Estate Check the job by Main
Contractor Thai Kajima Co.,Ltd
3.Project Unicharm Wellgrow Industrial Estate Renovation Work The Machine
( Dust Collector )Check the job by Main Contractor Thai Kajima CO.,Ltd
4.Project Daisin New Office Navanakorn Industrial Estate Check the job by Main
Contractor Thai Obayashi CO.,Ltd
5.Project Polymatech New Factory Bangpain Industraik Estate Check the job by Main
Contractor Thai Nishimatsu Co.,Ltd
6. Project Flood Recovery (Factory)
At Rojjana Industrail Estate Ayutthaya (Work contract one year Temporary )
A Factory Where Have To Recover Return to usual state
1.Toshin Chemetech Co,Ltd 2.Thai Nippon Food Co,Ltd 3.Oki Data Manufactoring
7.Project Iseton Departmentstore Relocation Work ( Food Court Area )
Central World Bangkok Rajjadumri Road
8.Project Relocation& Chiller Plant Replacement And Overhaul Work
(TRIPETCH ISUZU Head Quarter Vipavadeerungsit Road Bangkok )
9.Project Aspen Condominium Sukumvit 105 ( Soi Lasal ) Bangna Distric Bangkok
10.Project Chakkri Naruebodindra Medical Institute
Faculty Of Medicine Ramathipborde Hospital Mahidol University
Bangpla Bangplee District Samutprakarn Province