China Petroleum Pipeline bureau Co., Ltd. , Khonkaen
สำหรับสมาชิกเท่านั้น
- Review matrix weekly QA/QC, MDR Document status with our subcontractor.
- Verify the inspection request and summary document list and submit via E-mail to PMC/OWNER
- Follow-up the document As-build drawing, red line mark up with our subcontractor and update matrix weekly progress the all-document status to ensure the final document for handover to PMC/OWNER
- Coordinate with 3rd/party/DOEB to ensure the DOEB permit document.
- Coordinate with Site EPC Engineer to check the document status to ensure that completed.
พฤศจิกายน 2562 ถึง กุมภาพันธ์ 2563
ผู้ช่วยวิศวกร
สงวนวงษ์อุตสาหกรรม
สำหรับสมาชิกเท่านั้น
- Training cost estimate/take off material for structure such as retaining wall, machine building and small part of structure.
- Training engineering drawing.
- Training survey and measurement for update factory layout.
- Project Study different moment analysis. Affects the appearance of the building body in the reinforced concrete platform structure Support the filter placement machine by the method Working Stress Design”
“ ศึกษาการวิเคราะห์โมเมนต์ที่แตกต่างกัน สงผลต่อลักษณะขององค์อาคารในโครงสร้างแท่นคอนกรีตเสริมเหล็ก รองรับเครื่องอัดฟิลเตอรเพลส โดยวิธี Working Stress Design”
- Manage, control and stroge material for site work .
.- Coordinate with foreman and supervisor for solve the issue site work.
- Manage field activities and implement engineering designs
- Coordinate with SiKhiu yard and Associated company about transport segment.
- Schedule for work plan and transport segment plan.
- Verify the document Daily report/Daily Plan/stressing/Grouting /RFN/RFA/Payment report
or Report any client complaint to team, in regards to quality control work site.
- Follow-up the status of the document report to close the payment by monthly.