Quality Assurance And Quality Control Fabrication steel structure inspection Civil Structure Equipment and Pipe On Shop To site Installation
Contact and coordinate to ensure that operations are carried out according to the plan. Follow up on the plan on Work schedule.
In OPTIMAL FUEL GAS NETWORK PROJECT At Gas Separation Plants (GSPs) PTT