INSPECTION PIPING
1. Supervise and coordinate piping installation, fabrication, and modification activities on-site.
2. Ensure all piping works comply with engineering drawings, specifications, and safety standards.
3. Plan daily work schedules and allocate manpower, materials, and equipment effectively.
4. Monitor work progress, quality, and productivity, and resolve technical issues on-site.
5. Liaise with engineers, contractors, and other departments to ensure smooth workflow.
6. Conduct inspections and tests to verify piping systems meet project requirements.
7. Ensure adherence to health, safety, and environmental regulations during all activities.
8. Review Test Package.
9. Review WPS (Welding Procedure Specification), ITP (Inspection & Test Plan), and relevant codes/standards.
10. Review welder List and welder performance .
11. Review Drawings and Reference Documents.
12. Material Receive Inspection Verification Material Certificat Traceability(HeatNo/PieceMark) Check size, grade, and heat.Verify Mill Test Certificate (MTC) and material traceability.
13. Fit-up Inspection Verifyassemblycondition (Check Thickness, Mismatch, Transitionslop, JointNo,Flangeorientation, alignment, root gap, and high-lowand ) and tack weld the metal pieces together before moving to welding process.
14. Welding Control Check Electrodebaking/holding/issuecontrol Inspect before, during, and after welding Monitorin guseofcorrect.weldingconsumable, Size, Type& Condition.
15. Control welder per. Type,Drawing,Package.
16. Visual Weld inspection and alignment After weld record Follow Procedure Specification.
17. NDT (Non-Destructive Testing) Inspection Follow ITP.
18. Review Package.
19. Line Check Inspection and Record Punch List.
20. Punch List Inspection Clearing.
21. Pressure Testing (Hydrotest / Pneumatic Test) Inspection.
22. Inspect flushing, blowing, or pickling process.
23. Reinstatement Inspection Follow P&ID and Drawings.
24. Painting Inspection Follow Procedure Specification.
25. Final inspection Punch List and Review Package CheckPacking.Record Packinglist.
INSPECTION TANK AND SILO
1. Preparation Test Package.
2. Review WPS (Welding Procedure Specification), ITP (Inspection & Test Plan), and relevant codes/standards.
3. Review welder List and welder performance .
4. Review Drawings and Reference Documents.
5. Material Receive Inspection Verification Material Certificat Traceability(HeatNo/PieceMark) Check size, grade, and heat.Verify Mill Test Certificate (MTC) and material traceability.
6. Fit-up Inspection Verifyassemblycondition (Check Thickness, Mismatch, Transitionslop, JointNo,Flangeorientation, alignment, root gap, and high-lowand ) and tack weld the metal pieces together before moving to welding process.
7. Welding Control Check Electrodebaking/holding/issuecontrol Inspect before, during, and after welding Monitorin guseofcorrect.weldingconsumable, Size, Type& Condition.
8. Control welder per Type,Drawing,Package.
9. Visual Weld inspection and alignment After weld record Follow Procedure Specification.
10. Check Peaking&Banding,Plumbness,Levelness,Rounness before and after Welding.
11. Request Third party NDT (Non-Destructive Testing) Follow ITP.
12. Review Package.
13. Oil Test Inspection.
14. Vacum Test Bottom Plate Inspection.
พฤศจิกายน 2565 ถึง มิถุนายน 2567
QC Inspector
ICS Industrial Construction & Maintenance Services Public Co., Ltd
INSPECTION PIPING AND STRUCTURE
1. Preparation Test Package.
2. Review WPS (Welding Procedure Specification), ITP (Inspection & Test Plan), and relevant codes/standards.
3. Review welder List and welder performance .
4. Review Drawings and Reference Documents.
5. Material Receive Inspection Verification Material Certificat Traceability(HeatNo/PieceMark) Check size, grade, and heat.Verify Mill Test Certificate (MTC) and material traceability.
6. Fit-up Inspection Verifyassemblycondition (Check Thickness, Mismatch, Transitionslop, JointNo,Flangeorientation, alignment, root gap, and high-lowand ) and tack weld the metal pieces together before moving to welding process.
7. Welding Control Check Electrodebaking/holding/issuecontrol Inspect before, during, and after welding Monitorin guseofcorrect.weldingconsumable, Size, Type& Condition.
8. Control welder per Type,Drawing,Package.
9. Visual Weld inspection and alignment After weld record Follow Procedure Specification.
10. Request Third party NDT (Non-Destructive Testing) Follow ITP.
11. Review Package.
12. Line Check Inspection and Record Punch List.
13. Punch List Inspection Clearing.
14. Pre-pressure Test Inspection.
15. Pressure Testing (Hydrotest / Pneumatic Test) Inspection and record results.
16. Inspect flushing, blowing, or pickling process.
17. Pipe Spool Release Shop to Painting or Shop to Site.
18. Reinstatement Inspection Follow P&ID and Drawings.
19. Painting Inspection Follow Procedure Specification.
20. Final inspection Punch List and Review Package CheckPacking.Record Packinglist.
ประวัติการฝึกอบรม
ไม่ได้ระบุ
DP ENGINEERING AND TRAINING LIMITED PARTNERSHIP
Megnetic Particle Testing Level ll
ไม่ได้ระบุ
DP ENGINEERING AND TRAINING LIMITED PARTNERSHIP
Liquid Penetrant Testing Level ll
ไม่ได้ระบุ
DP ENGINEERING AND TRAINING LIMITED PARTNERSHIP
Radiographic Testing Level ll
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (พอใช้) อ่าน (ดี) เขียน (ดี)
ไทย 40 คำ/นาที อังกฤษ 40 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
Microsoft Office Word Excel, Auto CAD, Google, Line
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
Project RCA-5 PROJECT
Project TCP NEW PROJECT
Project LONG TERM REVENUE FOR PROJECT AND MAINTENANCE - CONSTRUCTION SERVICES
Project SH-20-21509 LLDPE and Catalyst Pilot Plant Project
Project CCPHA New LCO Tank and Associated Fuel Oil Facilities
Project DES15-PROJECT