Laemchabang Port (EXXON MOBIL/Bangchak sriracha refinery)
สำหรับสมาชิกเท่านั้น
•Planed and managed manpower to in charge each job. (Routine Maintenance, Line Item, Shut down)
•Control Planner and Assistance Planner.
•Cost Review and Cost negotiation.
•Prepare norm hour, Schedule and Backlog data for meeting.
•Fabrication complete certificate review and approved.
•Technical support for construction work.
•Issued site instructions to the supervisor to clarify scope of work.
•Participated in safety observation at work site.
•Attended weekly meetings with clients and presented the progress and the plan to them.
•Find project improvement to reduce cost each activity.
•Prepared proposal package for additional scope.
•Controlled cost and progress for each activity.
•Made tentative schedule for whole project scope of work (Using MS project).
•Prepared minute of meeting.
•Prepared project risk assessment (Prevent cost loss).
•Other requests from site manager and Project Manage.
มิถุนายน 2564 ถึง พฤษภาคม 2566
QS Engineer/ Project Engineer
CAZ (Thailand) Public Company Limited
Rayong (Clean Fuel Project :Thai Oil Site)
สำหรับสมาชิกเท่านั้น
•Site survey and check quantity of work for Monthly Invoice forecast.
•Compare and compile data for Monthly Invoice.
•Coordinate with customer about quantity of work and invoice claimed. (Petrofac South east
Asia & Samsung Engineering)
•Final Invoice and send to management for approval.
•Report to CEO (Korean) and Project control manager (Korean).
•Project cost control and Project management.
•Site Control.
•Work plan and look ahead.
•Monthly report to CEO and Project Manager.
•Technical Support. (Installation work and Repair work.)
•Review and negotiate Teaming, pricing, and other agreement types.
•Management subcontractor performance for conformance to contract scope of work, schedule and cost.
•General support.
พฤศจิกายน 2562 ถึง มิถุนายน 2563
Senior Field Engineer/ Permit Bearer
TRC construction Public Company Limited
Bangkok (Clean Fuel Project :Thai Oil Site)
สำหรับสมาชิกเท่านั้น
•Site Control and Site Management.
•Lead tools box talk.
•ontrol work on site according to plan, schedule and Standard.
•Work report to construction manager and Project Director (Daily report, Weekly
report).
•On-site Permit Control.
•Take off materials from the IFC drawing and cutting plan.
•Prepared risk assessment.
•Attended daily weekly meeting with customer (Petrofac and Thai Oil).
•Managed materials delivery from workshop to site.
•Issued MR to order materials, Tools and equipment.
•Prepare a plan for daily, weekly, monthly look ahead and report to project planner.
•Prepare Method statement, JSEA as per recommended from customer.
•Safety walk site audit and close recommended.
•Meeting and supervising sub-contractor to perform according to the plan.
•Cost control.
•Technical support. (Installation work and Repair Work)
•General Support.
February 2020 – July 2020 : KAEFER Engineering(Thailand) CO., LTD (AIBEL YARD LAEMCHABANG SITE): Project Engineer : Salary=35000 THB
August 2017 – December 2019 : Unithai Shipyard and Engineering (ESSO (Thailand) (EXXON MOBIL GROUP) Site) : Planner-Engineer : Salary=30000THB
February 2014 – August 2017 : CKC ENGINEERING AND CONSTRUCTION (ESSO (Thailand) (EXXON MOBIL GROUP) Site) : Planner : Salary = 20200 THB
ประวัติการฝึกอบรม
กันยายน 2564 ถึง กันยายน 2564
COUNCIL OF ENGINEERS
ASSOCIATE ENGINEER
กุมภาพันธ์ 2567 ถึง กุมภาพันธ์ 2567
BUREAU VERITAS
Lifting Supervisor
กรกฎาคม 2567 ถึง กรกฎาคม 2567
DIRECTION TRAINING
SAFETY SUPERVISOR
ความสามารถ
ความสามารถทางภาษา
พูด (ดีมาก) อ่าน (ดีมาก) เขียน (ดีมาก)
พูด (ดี) อ่าน (ดี) เขียน (ดี)
ไทย 40 คำ/นาที อังกฤษ 35 คำ/นาที
รถยนต์ ,รถจักรยานยนต์ ,
รถยนต์ ,รถจักรยานยนต์ ,
โครงการ / ผลงาน / เกียรติประวัติ / บุคคลอ้างอิง
2018 : (Night Shift Planner) Plant Shutdown (EXXON MOBIL SRIRACHA)
2018 : (PLANNER) TK-3906 CRUDE TANK BOTTOM PLATE REPLACEMENT (EXXON MOBIL SRIRACHA)
2020 : (Planner) PLANT TURNAROUND (EXXON MOBIL SRIRACHA)
2021 : (Senior Field Engineer) New tank storage build (Clean Fuel Project :Thai Oil)
2023 : (Lead Planner-Engineer) Plant Shutdown (EXXON MOBIL SRIRACHA)
2024 : (Lead Planner-Engineer) CCR CATALYST Plant Shutdown (BANGCHAK SRIRACHA Refinery)
2024 : (Lead Planner-Engineer) TK-3907 CRUDE TANK BOTTOM PLATE REPLACEMENT(BANGCHAK SRIRACHA Refinery)